Plan-and-Execute

Also known as: planner–executor, plan-then-act, task decomposition

Write the plan first, then execute step by step and replan on failure.

TrackAgentic systems FamilyCore loop Maturity Established ChangesDecision
01

Problem

On multi-part tasks, a step-by-step loop like ReAct makes greedy choices: it starts working before it has seen the whole job, repeats work, and loses track of which parts are done. Long tasks also get expensive when a large model re-reads the entire history for every small step.

  • Multi-part tasks benefit from seeing the whole job before starting.
  • Plans go stale as soon as a step returns something unexpected.
  • Strong reasoning is needed for planning but not for each small step.
  • Users and reviewers want to see the plan before anything runs.
02

Solution

Split the work into two roles. A planner, usually the strongest model, turns the goal into an ordered list of steps with clear completion criteria. An executor, often a cheaper model with tools, runs one step at a time and records the result. When a step fails or returns something that invalidates the plan, control goes back to the planner, which revises only the remaining steps.

03

Diagram

Goal Plannerstrong model Plan 1 · pull usage 2 · open cases 3 · renewal dates 4 · draft brief Executorcheaper model + tools Result next step failed or result changes the plan → replan remaining steps

The plan is a visible artifact that people can review or edit. Replanning touches only the steps that haven't run yet.

04

When to use

Use it when

  • Tasks have several distinct parts, like research, compare, then draft
  • You want a human to approve the plan before anything runs
  • Execution steps are simple enough for a cheaper model
  • Progress needs to be tracked or resumed after an interruption

Avoid it when

  • The task is one or two steps; planning is overhead
  • The environment is so unpredictable that every plan breaks immediately
  • Steps are tightly coupled and can't be described independently
05

Trade-offs

Latency Planning adds an upfront call; steps can run faster
Cost Expensive model plans once; cheap model executes
Complexity Plan format, state tracking and replanning
Reliability Fewer missed parts; progress is checkable

Gains

  • Fewer missed or duplicated parts on long tasks
  • A reviewable plan, which is also a natural approval point
  • Lower cost by putting the strong model only on planning

Costs

  • Plans can be confidently wrong about the environment
  • Replanning logic adds state to manage
  • The executor may lack context the planner assumed
06

Worked example

Scenario
An account team asks an agent to prepare a quarterly business review (QBR) brief for a customer.
  1. PlannerWrites 4 steps: (1) pull usage for the last 90 days, (2) list open support cases, (3) find renewal and expansion dates in CRM, (4) draft a one-page brief with risks and opportunities.
  2. Account leadApproves the plan and adds one step: include NPS comments from the last survey.
  3. ExecutorSteps 1–3 complete. Usage is up 18%, there are 2 open P2 cases, and renewal is in March.
  4. ExecutorThe new NPS step fails because the survey tool has no data for this account. The step is marked blocked and sent back to the planner.
  5. PlannerReplans the remaining steps by dropping NPS, adding a note to the brief that survey data is missing, and continuing with the draft.
  6. Run logStores the plan, each step’s output and the replan. The account lead sees exactly why NPS is missing.
07

Failure modes

FailureSymptomMitigation
Plan built on wrong assumptionsSteps reference data or tools that don't existGive the planner the real tool list; validate steps before running
Stale planExecutor keeps following a plan that no longer fitsDefine replan triggers, such as step failure or an unexpected result
Lost context between rolesExecutor misreads a step the planner meant differentlyWrite each step with inputs, expected output and done criteria
Replan thrashPlanner rewrites the whole plan on every hiccupOnly replan remaining steps; cap replans per run